Water on Driveway (Low): Installation Instructions

Prior to installation, have your local utility companies locate and mark the location of existing utilities.

Layout your drainage system and mark the location of trenches and individual parts to be installed with marking paint before digging. Carefully remove grass or plants that are located where the trench will be dug so they can be replanted after installation. Trenches should be dug such that they slope a minimum of 1% away from your house. Place all excavated dirt on a tarp so that it can be used later to backfill.

To speed up installation, a trenching machine can be used to dig all trenches, especially in areas with particularly hard soil. NDS drainage products have been designed to be installed in any soil type. Due to the variety of pipe types and sizes, double check that all pipe connection points are the correct size. Please follow all installation directions included with the individual parts of your drainage system. To create watertight connections between products, apply a bead of waterproof silicone to both parts and connect.

This system requires that the elevation of the Pop-Up Emitter be lower than the elevation of the area drain or the system will not drain.

  • Dig trench for drain pipe and Spee-D Channel Drain. 
  • Dry fit (no glue) the entire drainage system from the Spee-D Channel Drain to the pop-up emitter. 
  • Measure and cut all pipe to necessary lengths. 
  • After completing each step, glue parts together if a water tight connection is required.
     

TIP: If installing the drain in an existing concrete area, a wet concrete saw will be required to cut the concrete prior to installation.

  • A minimum of 4-inches of concrete should surround the channel where vehicular traffic will pass over the channel. 
  • Please follow installation instructions included with the channel when installing the channel drain. The Spee-D Channel Drain should be installed a minimum of 1/4” below the finished grade of the surrounding surface. 
  • Connect the required number of channel sections together using the Spee-D Channel Couplers. 
  • Place the grates on the channel and screw in place. 
  • Install end caps at the end of the runs as needed.
Install Spee-D Channel Drain

  • Determine the way in which the channel drain will be drained (either via an End Outlet or Bottom Drain) and connect the appropriate drain pipe. 
  • Glue and connect elbows as needed. 
  • Continue drain pipe in direction of where the Flo-Well will be installed.
Connect elbow to drain on Spee-D Channel Drain

  • Connect the drain pipe to an elbow with a weep hole. The elbow should be installed with the weep hole on the horizontal side of the elbow. 
  • Slide the Pop-up Emitter onto the elbow. An additional length of pipe can be used to bring Pop-up emitter to the surface.
  •  

TIP: To avoid damaging your Pop-Up Emitter with your lawn mower, raise the cutting level of the blades or avoid passing the mower over the Pop-Up Emitter.

  • Backfill and replace any grass or plants that were removed.
     

TIP: DO NOT BACKFILL WITH SOIL WITH HIGH CLAY CONTENT.

Water must be able to easily pass through the backfilled soil.

Where to Get It

Where to Buy NDS Solutions

Find a Dealer or Distributor near you

NDS products are available at a variety of leading home & garden retailers and professional distributors.  Click below to find a store near you. 

Find a Contractor

Need More Help?

Find a Contractor

Enter your location and find professional drainage and irrigation contractors in your area that have completed NDS training and certification.

Need help? Ask Dr. Drainage

Have questions? Need help? Want to know more?

Find out how NDS solutions experts can help you solve your water management problems.